Skip to main content
BilgeQor

OT, ICS and IoT Security Assessment

Understand the cyber risk in your industrial and connected-device environments through an assessment planned around safety and uptime, with a prioritised plan your engineers can act on.

Scope-defined engagement
  • UPRELAY YAZILIM TEKNOLOJİLERİ LİMİTED ŞİRKETİIstanbul, Türkiye
  • BilgeQor LtdLondon, United Kingdom
  • PT BILGEQOR INTELLIGENT SYSTEMSJakarta, Indonesia
We reply within 24 hours.

Is OT, ICS & IoT Security the right fit?

Best suited for

  • ✓Manufacturers, utilities, energy, logistics and building operators with control systems that are now connected to corporate or cloud networks
  • ✓Device makers who need an independent security review of firmware, mobile apps and cloud back ends before release
  • ✓Plant and operations leaders asked by insurers, customers or regulators to show how industrial risk is managed
  • ✓IT security teams that are responsible for OT networks they did not design and want a clear starting picture

Another service fits better if

  • –You want 24/7 monitoring of your environment: Managed SOC & EDR covers that
  • –You want an adversary simulated against your IT estate: Red Team Exercise covers that
  • –You want a test of your web applications and networks: Penetration Testing covers that

What We Evaluate

  • A trustworthy asset picture without disturbing operations: discovery and inventory by passive methods, covering controllers, HMIs, historians, gateways and network gear
  • Clear boundaries: network architecture and segmentation review, including the IT and OT boundary, remote access paths and vendor connections
  • Fewer exposed services: configuration and protocol review for common industrial protocols, with attention to authentication and exposure
  • Confidence before release: IoT device assessment covering hardware interfaces, firmware, update mechanism, credentials, communications and the companion app and cloud back end
  • Realistic fixes: account, remote-access and patching-process review that respects maintenance windows and vendor support
  • Risks ranked by what matters: threat modelling tied to process impact, so findings are ordered by consequence to safety and operations
  • A roadmap your plant can follow: quick, low-disruption changes separated from changes that need a shutdown or vendor involvement

Deliverables

Typical timeline
Typically 4–8 weeks from signed scope, depending on the number of sites and devices, confirmed in your written proposal.
Pricing
Fixed-fee proposal after a free scoping call.
Asset inventory for the scope you choose
Network and segmentation findings with a diagram of observed paths
Device or firmware findings with severity, evidence and remediation guidance
Risk-ranked roadmap that notes operational constraints for each action
Executive summary for plant, operations and board audiences
Working session with engineering and operations staff

Before we start

  • +Sign-off from the asset owner and the operations lead, covering methods, windows and stop conditions
  • +A named plant or operations engineer who can approve and pause activity at any time
  • +Test windows, with active testing limited to lab, staging or approved replicas unless production testing is confirmed in writing
  • +Network diagrams, asset lists and vendor documentation, where available
  • +Vendor and third-party consent where equipment is leased, managed or under warranty conditions
  • +Site safety induction and access arrangements for any on-site work

Not included (available separately)

  • Active testing of live safety-critical systems without written agreement and operations sign-off
  • Replacement, reconfiguration or patching of control equipment, unless separately scoped
  • Continuous monitoring or 24/7 operation of an OT security operations centre: available separately as Managed SOC & EDR
  • Functional-safety certification, a formal compliance determination, or physical security testing of sites and buildings

How It Works

1

Scoping and safety planning

Before any technical activity, a signed scope sets the sites, safety constraints, test windows and a named person who can stop work, so your plant stays protected.

2

Passive discovery

We build the asset and communication picture with passive methods and documents, so normal operation is not disturbed.

3

Assessment

We review architecture, configuration, remote access and devices, using active tests only in environments you have approved for them.

4

Analysis

We rank findings by process and safety consequence, and work out which fixes can be made safely and when.

5

Reporting and workshop

We deliver the report and roadmap and run a working session with your engineers and operators.

Request scope first. We reply within 24 hours and confirm in-scope assets, operations sign-off and safety constraints in a written proposal. Work begins once the written scope is confirmed.

Scope & Quotation

Final scope and quotation depend on your sites, assets and operational constraints.

Why BilgeQor

  • Safety comes first: passive discovery, written stop conditions and a named engineer who can pause work at any time.
  • You receive a risk-ranked roadmap that notes the operational constraint on each action, so engineers see what can be done and when.
  • Sites, systems and test windows are set in a written scope before technical activity; the team works remotely, coordinated from Istanbul, Jakarta and London.

Frequently Asked Questions

Related Services

AI Red Teaming and LLM Security Assessment

Authorised adversarial testing of LLM applications and AI agents for prompt injection, data leakage and model misuse, with EU AI Act readiness mapping.

Smart Contract Security Audit Services in Oman | BilgeQor

Manual and tool-assisted audit of Solidity and other smart contracts, with severity-graded findings and a retest of fixes.

Map your OT risk without stopping production

Send your sites, systems and device list; a fixed-fee assessment proposal follows.

What happens after you submit

  1. We review your request
  2. Scope conversation
  3. Written proposal

We reply within 24 hours.